F.A.Q

Questions About MIE Trak™


Which computer do I install the protection block on?

The protection block should be installed into the USB port of a workstation that accesses MIE Trak frequently. If the workstation is running an NT-based operating system (Windows NT, 2000, XP), the Sentinel driver is needed in order for the protection block to be read correct by the operating system. The installation for the Sentinel driver can be found in the Utilities folder of the MIE Trak installation directory.


When entering in employee breaks in the Employee Shift Maintenance, what format must the times be?

The time and duration of the employee break in the scanning menu must always be in regular clock time intervals, even if you have your system parameter set to decimal hours.


How do I set up a coil material in Material Maintenance?

The key elements for setting up coils in MIE Trak:

1. The part size and blank size must have length and width dimensions.

2. The stock size should only have a width (length = 0)

3. A value should be typed for the material thickness.

4. Sell Unit should be "LBS".

5. Ship Unit should be "COIL".

6. Vendor Unit is always 1.

The formula is:  Weight Factor = (Weight) / (Width * Length * Thickness)

Ex: A 48" x 120" sheet of 16 Gauge CRS weighs 100 pounds

Weight Factor = 100 / (48 * 120 * 0.0592) = 0.29326201

How do I set up a bar stock material in Material Maintenance?

How do I set up a bar stock material in Material maintenance?
The key elements for setting up bar stock in MIE Trak:

1. Width = 0 for the part size, blank size and stock size.

2. Sell Unit should be "Foot" or "LBS".

3. Ship Unit should be "Length".

4.  A value should be entered for the vendor unit, which is the length of the stock size in number of feet if the sell unit is "Foot" or weight of the stock size in number of pounds if the sell unit is "LBS".

5. A value should be typed for Weight Factor, which is the number of pounds per cubic inch.


What parameters should I use when setting up the TT5 (Barcode Keypad) device?

SR1=00000010
SR2=10011010
SR3=00000000
SR4=10100000
SR5=10000000
OPERATING MODE=003
CONTRAST=004
UNIT ADDRESS=050 (Unique # for each device)
COLUMNS=024
OPTIONS=000


What folders/directory within the MIE Trak installation do I need to backup on a regular basis?

CUSTOM
REPEXT
REPORTS
any database directories (the name of these folders varies, but it is usually similar to the company's name)

 

 


MIE Products & Solutions
Material Requirements Planning (MRP)
Supplier Relationship Management (SRM)
Procurement Reporting and Supplier Performance Software
Purchasing System
Quality Management Software
Document Management Software
Exploded Bill of Materials
Product Data Management
Product Configuration
Project Costing
Project Estimating Software
Enterprise Asset Management(EAM)/CMMS System
Fixed Asset Management
Materials Management
Procurement Services
Work Order Management
Supply Chain Management (SCM)
Advanced Production Scheduling Software(APS)
Real-time Advanced Manufacturing Planning
Capacity Requirements Planning (CRP) Software
Demand Planning
Enterprisewide Planning Software
Inventory Management
Master Production Scheduling
Material Requirements Planning (MRP)
Warranty & Returns Management
Work Management
Financial Modules
General Ledger
Accounts Payable
Accounts Receivable
Cash Management
Cost Accounting & Management
Financial Reporting
Sales Analysis
Sales Opportunity Analysis
Replenishment Planning & Scheduling
Material Requirements Planning (MRP) Software
Service & Parts Planning Software
Supply Chain Planning Software
Supply Chain Reporting Software
Manufacturing Flow Management Software
Kitting & Kit Processing Software
Time & Attendance and Labor Reporting
Lean Manufacturing
Kanban Planning & Execution
Material & Kanban Replenishment
Lot & Serial Reporting
Materials Management
Plant Floor Data Collection
Production Order Management
WIP Management
Work Orders and Process Routers
Work/Production Orders
Production Reporting Systems
Quality Reporting Systems
Production Scheduling Software
Floor Scheduling
Supply Chain Execution(SCE)
Supply Chain Manangement (SCM)
Warehouse Inventory Management
Data Collection Inventory Tracking
Capacity Requirements Planning
Demand Planning
Enterprisewide Planning
Inventory Management
Inventory Optimization
Master Production Scheduling
Human Resources Module
Supply Chain Management (SCMS)
Advanced Production Scheduling Software
Finite Production Scheduling
Production Schedule Reporting
Manufacturing Scheduling Systems
Fixed Assets Accounting
General Ledger
MIE Trak PRO ERP
MIE Accounting
MIE Kiosk Data Collection and Scheduling
MIE QuoteIT PRO Estimating
MIE CRM
MIE Fixed Asset
MIE Docs DMS System
MIE Purchasing
MIE Inventory
MIE IN/OUT Board
MIE Calendar
MIE Maintenance CMMS
MIE Journal
MIE Exchange B2B Portal
MIE Task Project Management
MIE Chat
MIE Quote Foxpro Estimating
MIE Trak Foxpro Manufacturing
MIE Dashboard
MIE QuoteIT CadSolid
Fabricators
Contract Manufacturing
Steel Fabrication
Industrial Manufacturing
Aerospace Industry
Automotive Industry Systems
Machine Shop Industry
Fabrication Shops
Mold and Die Systems
Repair Shop
Captive Manufacturing Shop
Screw Machine Shop
Plastic Shop Manufacturer