Scheduling

Production Scheduling in MIE Trak Pro

Schedule work orders, machines and employees with MIE Trak Pro. Explore finite scheduling, drag-and-drop planning and real-time shop floor updates

When the shop changes, your schedule should too

Plan around real shop capacity, adjust priorities as jobs change, and keep production moving with MIE Trak Pro.

Here’s how scheduling works with MIE Trak Pro

Every job has its own requirements. MIE Trak Pro connects work orders, routings, production times, and due dates to help you build a schedule around how your shop operates.

  • Customer due dates
  • Work order routings
  • Setup & run times
  • Machine & work center capacity

Choose the scheduling method that fits your shop.

No two manufacturing floors operate the same way. That’s why MIE Trak Pro gives you four scheduling approaches:

  1. Backward Infinite Scheduling — Plan backward from customer due dates.
  2. Forward Finite Scheduling (APS) — Build schedules around available capacity and evaluate what-if scenarios.
  3. Whiteboard Scheduling — Manually assign and prioritize jobs on individual machines.
  4. Cell Scheduling — An additional scheduling option for cell-based production environments.

Use the methods that match your workflow instead of forcing your shop into a single scheduling approach.

Scheduling

Change the plan when priorities change.

Rush order? Machine unavailable? Need more capacity?

Use APS scheduling scenarios to evaluate different production plans, or make hands-on adjustments with the Planning Board.

Drag and drop jobs to different times or machines, reorganize priorities, and split scheduled work across machines when needed.

Your schedule can change when your shop does.

Get the latest schedule onto the shop floor.

Once work is scheduled, your operators need to know what’s next.

MIE Kiosk connects Whiteboard job assignments to the shop floor, allowing employees to view their scheduled work, find job details, and clock into production.

The people running the jobs can see what needs to happen next.

See your workload before it becomes a bottleneck.

See where your shop has capacity, where work is building up, and which jobs may be at risk of running late.

Use work center loading reports, machine capacity views, scheduling boards, and APS projected completion dates to make informed production decisions.

Less guessing. More control over your shop floor.

Scheduling

More Scheduling Features

Here are just a few additional features that you can expect with MIE Trak Pro Scheduling.

  • View real-time schedules and changes on the shop floor using MIE Kiosk
  • Nest multiple work orders together to utilize machine time efficiently
  • Schedule for multiple divisions or locations
  • Utilize multiple ways of scheduling production—backward, forward, advanced planning, drag-and-drop, etc.
  • Create a schedule directly from a work order
  • Split work orders to schedule on multiple stations or at multiple locations to ensure delivery is on-time

Book a 1-on-1 Meeting with andew ortega

Book a 1-on-1 session with an ERP expert to see exactly how MIE Trak Pro scheduling fits your workflow.

Andrew Ortega

Andrew Ortega

Free Whitepaper

What If My Shop Floor Were More Efficient?

  • Understand the differences between Backwards Infinite, Forward Finite, Whiteboard, and Cell Scheduling—and when to use each.
  • Match the right scheduling method to your unique production environment and goals.
  • Use ERP software to streamline scheduling and improve overall production planning.